Public procurement · Separate award from delivery

Ningguo rural charging EPC

Award 18 September 2026 · planned duration 360 days

Selected findings reviewedReview snapshot 2026-10-24Independent review not established4 original files available ↓

WHAT THE HELD EVIDENCE SAYS

An original award names a consortium for CNY 16,176,773.51. The tender specifies a 10% advance per started project excluding design.

The award establishes the announced consortium and price. It does not establish each member’s revenue, installed capacity or payment.

What remains open

Award dated 18 September 2026; planned duration 360 days. No acceptance or payment established; absence at this early stage does not demonstrate delay.

01 · IMPLEMENTATION

Evidence at each step

Recorded stages describe the review snapshot. An open stage means it is not established here; it is not a finding of failure.

  1. Call / rulesRecorded
  2. Original annexRecorded
  3. Award / allocationRecorded
  4. ContractNot established
  5. AcceptanceNot established
  6. Reported executionNot established
  7. Bank paymentNot established

STRESS-TEST THE CONCLUSION

Can I make this claim?

Reasoning checks grounded in the reviewed case. Open a claim to see what supports it, what it would overstate and the next test.

“The project has installed 142 chargers.”
Not established

The 142 chargers are planned equipment in the tender. An award is held, but acceptance and actual delivery have not been established.

Planned capacity cannot be reported as installed capacity.

Next test: Obtain acceptance records and equipment-level delivery evidence.

Editorial reasoning aid based on the 2026-10-24 review snapshot; not a new independent adjudication.

“Each consortium member won CNY 16.18m of revenue.”
The source does not support this claim

CNY 16,176,773.51 is the total consortium award, not an amount attributable to each member and not recognised revenue.

Allocating the full award to every member would duplicate the value and change its accounting meaning.

Next test: Obtain member work shares and the relevant revenue-recognition evidence.

Editorial reasoning aid based on the 2026-10-24 review snapshot; not a new independent adjudication.

CLAIM → CLAUSE → ORIGINAL

Evidence receipts

3 receipts

Text matching checks the saved wording. It does not establish that a claim is true or that an event occurred.

01Planned equipment: 142 chargers—10×240kW,24×60kW,108×40kW—and four storage cabinets.S109 · PDFpage3, section2.8
Quote found in saved textSource metadata matches review
安装充电桩142套
Stage / meaning
specifies planned equipment
Entity or object
142 chargers / four125kW-261kWh cabinets
Review date
2026-10-24

Planned quantities; no installed-capacity or acceptance claim.

Provenance & review basis

Not established; original review snapshot and automated text check are distinct.

Receipt receipt-3b906c5394445e3b

Source SHA-256 3173b3f9999fcc5c381bcd1200b4620ca05d3c716212e1d5f5cafcc583393bad

Review SHA-256 3173b3f9999fcc5c381bcd1200b4620ca05d3c716212e1d5f5cafcc583393bad

02Tender advance is 10% of each started project, excluding design fees.S109 · PDFpage75, clause 14.2.1
Quote found in saved textSource metadata matches review
单项开工项目总价(不含设计费)的10%
Stage / meaning
has tender payment condition
Entity or object
10% per started project excluding design
Review date
2026-10-24

Different denominator from Guangde; a contractual condition, not realised financial support.

Provenance & review basis

Not established; original review snapshot and automated text check are distinct.

Receipt receipt-e76438ea2a3e5a7b

Source SHA-256 3173b3f9999fcc5c381bcd1200b4620ca05d3c716212e1d5f5cafcc583393bad

Review SHA-256 3173b3f9999fcc5c381bcd1200b4620ca05d3c716212e1d5f5cafcc583393bad

03The 18 September award names an Anhui Xinchen-led consortium for 16,176,773.51 yuan; design and construction components reconcile.S127 · Award table: winning bidder and price
Quote found in saved textSource metadata matches review
16176773.51元
Stage / meaning
announced award to
Entity or object
安徽鑫辰电气设备有限公司
Review date
2026-10-24

Consortium award, not grant or payment. Other members:安徽丰洲建设科技有限公司 and中科盛华工程集团有限公司.

Provenance & review basis

Not established; original review snapshot and automated text check are distinct.

Receipt receipt-c9ae40f88276010d

Source SHA-256 71b12ec0c63c265733d9aeeec2d157fe33d976487a07d6f7834d020dfe248af0

Review SHA-256 71b12ec0c63c265733d9aeeec2d157fe33d976487a07d6f7834d020dfe248af0

PRESERVED EVIDENCE

Source register

4 source records

Availability is checked locally. Each original download verifies its bytes against the stored SHA-256. Matching source metadata is a separate check.

S109 · PDF

安徽省宁国市美丽乡村新能源充电(一期)项目-试点EPC工程招标文件.pdf

annex · extracted

Source provenance

Published URL: https://ggzyjy.xuancheng.gov.cn/EpointWebBuilder/WebbuilderMIS/attach/downloadZtbAttach.jspx?attachGuid=bc9014f4-46c7-473c-81b5-ea7a2fe8a6c4&appUrlFlag=ztb002&siteGuid=7eb5f7f1-9041-43ad-8e13-8fcb82ea831a

Retrieved: 2026-10-24T09:10:31.416081+00:00

Snapshot version: matches_snapshot

3173b3f9999fcc5c381bcd1200b4620ca05d3c716212e1d5f5cafcc583393bad

You can restart this tour at any time from “Take a tour”.