SHANGHAI · CHARGING INFRASTRUCTURE

One funding round.
Two documentary stages.

The consultation and issued allocation reconcile to the same aggregate. That advances the programme’s evidence chain. It does not establish payment to the proposed recipients.

01 · PROPOSED SCHEDULE

30 June 2025

568,549,591.85 CNY

Four components · 1602 detail rows

Recipient rows remain proposals

02 · ISSUED ALLOCATION

10 July 2025

568,549,591.85 CNY

Signed 2025-07-08 · published 2025-07-10

Programme-level allocation

03 · RECIPIENT PAYMENT

Not established

No named final distribution schedule, bank receipt or taxi pass-through evidence obtained in this review.

No amount inferred
Do not add the first two amounts.

They represent the same funding round at different stages. Equal totals can conceal changes to individual allocations that net to zero. Neither total establishes a specific firm’s receipt.

REPRODUCIBLE ARITHMETIC

Reconcile the programme total.

Arithmetic controls match
Recorded proposal component totals; rows are not distinct firms.
ComponentDetail rowsAmount (CNY)Recorded control
Basic energy subsidy672164,400,689.45Matches
Star-rating energy subsidy496338,101,168.20Matches
Taxi charging / swapping subsidy43359,047,734.20Matches
Municipal platform17,000,000.00Matches
Component sum1602568,549,591.85Difference: 0.000000 CNY

56854.959185 万元 × 10,000= 568,549,591.85 CNY

Decimal sum of four recorded component totals and 万元 × 10,000 conversion. This check does not re-transcribe all 1,602 source rows.

Match basis: Same four components and supported periods; exact total after yuan/万元 conversion. Administrative source family, not independent payment confirmation. Review snapshot: 2026-10-24. This selected round is not a time series or an estimate of all Shanghai support.

READ WHAT THE NOTICE ACTUALLY SAYS

Allocation is not a payment receipt.

Inspect signed PDF, page 3 ↗

The issued plan allocates 56,854.959185万元 to the same four components and supported periods.

5.按照《上海市鼓励电动汽车充换电设施发展扶持办法》(沪发改规范〔2025〕3号)规定,安排经审核通过的2024年电动汽车充换电设施度电基本补贴、星级度电补贴、2024年四季度至2025年一季度电动出租车充换电补贴及2024年市级平台补贴资金,由市节能减排专项资金安排56854.959185万元。
Quote found in saved textS85 · Notice item 5Source version matches review

Aggregate programme match. No firm-level final schedule, bank receipt or taxi pass-through evidence obtained. Original firm rows remain proposals. Amount is not additional support to add to consultation totals.

Inspect saved source ↗

The notice instructs the department to apply to the municipal finance bureau for disbursement.

请根据上述资金安排计划向市财政局申请拨付资金,并严格按照相关管理办法和实施细则的规定,合理规范使用各项资金,确保资金使用的公开、公正和公平,进一步提高资金使用效率。
Quote found in saved textS85 · Notice closing instructionSource version matches review

Aggregate programme match. No firm-level final schedule, bank receipt or taxi pass-through evidence obtained. Original firm rows remain proposals. Amount is not additional support to add to consultation totals.

Inspect saved source ↗

SOURCE FAMILY

Three formats, one administrative origin.

The HTML notice, WPS annex and signed PDF corroborate the administrative record. They are not three independent confirmations of recipient payment. The proposal-stage annex remains a separate record.

S85 · Issued allocation notice

Original available locally · matches_snapshot

Open source ↗
Review fingerprintfb94e979d53a5d1eccf8019f86a786a6d164f06a43fc27f1499a831ab858e03b

S88 · Allocation annex (WPS)

Original available locally · matches_snapshot

Open source ↗
Review fingerprintcdd61d2789a51a571dccc7f0d8767f645674e2c98dee3a38cc93ea7b9964ad15

S89 · Signed allocation notice (PDF)

Original available locally · matches_snapshot

Open source ↗
Review fingerprint4d5cb3755f20a804dd6f2b744aa348aadd43ab7b7b7b3089f2a899b782651ffd

WHAT WOULD ADVANCE THE FINDING?

Follow the distribution, then the receipt.

Named final distribution schedule, exact recipient identities and disbursement / receipt records; taxi pass-through evidence where relevant.

Until those records are obtained and reviewed, keep firm observations at proposal stage. A later funding notice for a different support period cannot close this gap.

Inspect proposal observations ↗